Rodrigo Molto appointed to global ports organization
A Marine Structural Engineer in our Madrid office, Rodrigo has been appointed Secretary of the YP-Com of PIANC; the World Association for Waterborne Transport Infrastructure.
Sort by: Relevance | Date
Edit Search
A Marine Structural Engineer in our Madrid office, Rodrigo has been appointed Secretary of the YP-Com of PIANC; the World Association for Waterborne Transport Infrastructure.
Creating value by solving the world’s critical resource energy and infrastructure challenges.
Advisian supports courageous individuals. We’ll encourage, challenge and inspire you – in fact, we’ll dare you to be different.
Join us. Do more than just thinking. Change the world.
Natural inlets on littoral drift shores comprising entrance bars, shoals and channels are continuously in a state of flux, changing in response to variations in controlling hydrodynamic forces such as floods, variations in the spring-neap tidal range, varying wave climates and rates of littoral drift transport.
Subsea mining as a commercial venture has been around since the 1960s, however it has been slow to gain traction. The greatest barrier to its widespread adoption is environmental in nature. The question many countries are asking, including New Zealand, is ‘Can subsea mining be sanctioned whilst maintaining a focus on environmental sustainability?’
The Deepwater Horizon oil spill presented an unprecedented threat to the Gulf of Mexico marine resources. It is the largest accidental marine oil spill in history, with almost 5 million barrels spilled. Advisian has designed, developed and now deploy Oil Spill Tracking Buoys (OSTBs) to accurately track a surface oil spill.
The Dudgeon Point Coal Terminals project involves the development of two new coal terminals with a combined capacity of 180 mtpa throughput at Dudgeon Point, within the Port of Hay Point. NQBP required environmental approval for the project under separate Queensland and Australian Government legislation and terms of reference.
To support decision-making about future wastewater management options for the Burwood Beach and Boulder Bay Wastewater Treatment Works, scientifically robust environmental assessment programs were required to assess social and economic factors and arrive at a sustainable ongoing options for both plants.